Eurofins E&E NA has recognized the hardware platform 7818 CORNET System as compliant with stringent safety standards
We are delighted to announce a momentous achievement at Dynamics Scientific, Inc. as Eurofins E&E NA has officially recognized our hardware platform, the 7818 CORNET System, as compliant with stringent safety standards. This recognition, encompassing standards such as UL60079, UL121201, UL1203, UL61010, and similar CSA standards, underscores our unwavering commitment to safety and quality in all our endeavors.
7818 CORNET System Safety Standards
- UL 60079-0:2019 Ed.7+R:15 Apr 2020 – Explosive Atmospheres – Part 0: Equipment – General Requirements
- CSA C22.2#60079- 0:2019 Ed.4 Explosive Atmospheres — Part 0: Equipment — General Requirements
- UL 60079-11:2013 Ed.6+R:14Sep2018 Explosive Atmospheres – Part 11: Equipment Protection by Intrinsic Safety “i”
- CSA C22.2#60079-11:2014 Ed.2 Explosive Atmospheres – Part 11: Equipment Protection by Intrinsic Safety “i”
- UL 121201, Ninth Edition, Nonincendive Electrical Equipment for Use in Class I and II, Division 2 and Class III, Divisions 1 and 2 Hazardous (Classified) Locations (Rev April 1, 2021)
- CSA C22.2 No. 213-17, Third Edition, Nonincendive Electrical Equipment for Use in Class I and II,
- UL 1203:2013 Ed.5+R:31Mar2021 Explosion-Proof and Dust-Ignition-Proof Electrical Equipment for Use in Hazardous (Classified) Locations
- CSA C22.2#30:2020 Ed.4 Explosion-proof Equipment
- UL 61010-1:2012 Ed.3+R:19Jul2019 Electrical Equipment for Measurement, Control, and Laboratory Use; Part 1: General Requirements
- CSA C22.2#61010-1-12:2012 Ed.3+U1;U2;A1 Safety Requirements for Electrical Equipment for Measurement, Control, and Laboratory Use Part 1: General Requirements
- UL 61010-2-201:2018 Ed.2 Safety Requirements For Electrical Equipment For Measurement, Control, And Laboratory Use – Part 2-201: Particular Requirements For Control Equipment
- CSA C22.2#61010-2-201:2018 Ed.2 Safety Requirements for Electrical Equipment for Measurement, Control, and Laboratory Use – Part 2-201: Particular Requirements for Control Equipment
The certification of the 7818 CORNET System enables us to deploy the COMPACS system in North America, the Middle East, and around the globe. This achievement marks a significant milestone for deploying the SROMM technology of safe resource-saving operation and maintenance of machinery globally.
We extend our heartfelt congratulations to the exceptional team of Dynamics Scientific, whose dedication and hard work have been instrumental in achieving this milestone. Your relentless pursuit of excellence drives us forward and reinforces our position as a leader in the equipment reliability industry.
As we celebrate this achievement, we also recognize that it is just the beginning of our journey toward even greater accomplishments. With a steadfast commitment to innovation and excellence, we are ready to make further strides in advancing industrial safety standards and revolutionizing maintenance practices worldwide.
Explore Our Case Studies
Acoustic Emission Testing Case Study: Real-Time Monitoring Saves Reactor With Critical Crack
04/11/2025
In industries where pressure vessels, reactors, and complex welded structures are exposed to high temperatures and harsh environments, unexpected failures...
Read More
Condition-Based Maintenance: From Scheduled Repairs to Real-Time Decisions
07/30/2025
In oil and gas, petrochemical, mining, and other industries’ operations, every hour of uptime is critical. Traditional maintenance strategies, which...
Read More
Real-Time Pipeline Monitoring and Leak Detection with the COMPACS System
05/23/2025
Real-time Pipeline Monitoring Modern real-time pipeline monitoring solutions aim to prevent leaks before they escalate into disasters. As infrastructure ages...
Read More
